Welcome to Frankton Model Shop. We are open 9am-5pm Mon-Fri and 9am-3pm Saturday Closed Sundays

AfterPay available

Proudly Supplying Hobby Products for over 75 Years

We now ship to Australia

Hornby  |  SKU: HORR60077

Hornby BR 75T Operating Maintenance Crane

$178.50 $196.50
Tax included Shipping calculated at checkout.


Delivery and Shipping

We use tracked courier for fast delivery New Zealand wide

Description

HOR R60077 Hornby BR, Operating Maintenance Crane - Era 4- 2023 Catalogue

The breakdown crane is as much a part of railway infrastructure as much as it is a wagon. Such cranes began to appear in 1875, growing in size and complexity. 

Over 176 cranes have appeared around the UK since their introduction, with the most modern cranes able to lift entire locomotives off the ground. Being the national operator from 1948 BR inherited a patchwork of rolling stock from its constituent companies, as they had done twenty five years earlier, including all breakdown cranes in service.

BR employed some of the largest rail cranes, with the heaviest of the lot designed for the heaviest of tasks, such as the re-railing of locomotives, or tasks that may see a locomotive needing to be removed from the track all together

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Google Pay
  • Mastercard
  • Shop Pay
  • Union Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

Hornby

Hornby BR 75T Operating Maintenance Crane

$178.50 $196.50

HOR R60077 Hornby BR, Operating Maintenance Crane - Era 4- 2023 Catalogue

The breakdown crane is as much a part of railway infrastructure as much as it is a wagon. Such cranes began to appear in 1875, growing in size and complexity. 

Over 176 cranes have appeared around the UK since their introduction, with the most modern cranes able to lift entire locomotives off the ground. Being the national operator from 1948 BR inherited a patchwork of rolling stock from its constituent companies, as they had done twenty five years earlier, including all breakdown cranes in service.

BR employed some of the largest rail cranes, with the heaviest of the lot designed for the heaviest of tasks, such as the re-railing of locomotives, or tasks that may see a locomotive needing to be removed from the track all together

View product